Planning permission was secured for the reconfiguration of an existing HMO, increasing the accommodation from 9 to 13 en-suite bedrooms across the ground floor, first floor and loft. The approved layout includes two communal kitchens and makes efficient use of the existing 283.13 m² floor area without increasing the building’s footprint.